Works well
"These replacement bulbs work just like the orinal one. I will order again"
15-0575 Funda de cuarzo UV para ATS EV-12E y GDS-12
Automatic deliveries and charges at your selected frequency. Skip, reschedule, or cancel through your subscription account. View subscription details.
Funda de cuarzo de repuesto para el sistema UV Aqua Treatment Services (ATS) EV-12E y GDS-12 y otros sistemas UV genéricos. La funda de cuarzo 15-0575 está cerrada en un extremo con un diámetro exterior de 24,5 mm y una longitud de 759 mm (29,875 pulgadas). La funda de cuarzo evita que la lámpara UV se cortocircuite y mantiene la temperatura de funcionamiento ideal de la lámpara de 104 grados Fahrenheit. La acumulación de minerales dificulta la eficacia de la lámpara.
Overall rating: 5.0 / 5 from 6 reviews.
Review topics: [].
"These replacement bulbs work just like the orinal one. I will order again"
"Fits my GDS 12, just like it says."
"Great packaging, arrived quickly after ordering. Have not changed out uv light tube. Scheduled for December 2023 Will be ordering my yearly supply from ESP"
"The product is good quality and the service is great, timely delivery."
"Great customer service. Will buy all water needs from them in the future. Thanks"
"We received our order quickly!"
Q:
Which systems use the 15-0575 quartz sleeve?
A:
The catalog lists: EV-12E, GDS-12, ATS EV-12E, ATS GDS-12, ATS PFC-12. Confirm the exact model or part number on your equipment before ordering 15-0575 quartz sleeve.
Q:
What does the 15-0575 quartz sleeve do?
A:
The quartz sleeve isolates the UV lamp from chamber water while allowing UV energy to pass through. It is closed at one end, approximately 24.5 mm outside diameter and 759 mm long.
Q:
When should the quartz sleeve be replaced?
A:
Replace it if cracked, chipped, clouded, etched, or no longer restorable during maintenance. Many sleeves are replaced around every 24 months, subject to the equipment manual and water conditions.
Q:
Can mineral scale be removed from the sleeve?
A:
Light deposits can often be removed with the manufacturer-approved method. Rinse thoroughly and replace the sleeve if clouding or deposits remain.
Q:
Should the sleeve O-rings be inspected?
A:
Yes. Replace seals that are cut, flattened, stretched, or brittle, and use only a light coating of food-grade silicone lubricant if the manual directs it.
Q:
What installation mistakes can damage a quartz sleeve?
A:
Forcing the sleeve, uneven retaining pressure, grit on sealing surfaces, and pinched O-rings can cause cracks or leaks. Shut off water and power, relieve pressure, and handle quartz with clean gloves.