great new membrane
"we are getting lots of great clean water again"
Membrana de Ósmosis Inversa AXEON HF1-4014 150 PSI 600 GPD 200377
Automatic deliveries and charges at your selected frequency. Skip, reschedule, or cancel through your subscription account. View subscription details.
La membrana de OI HF1-4014 genuina de Axeon mide 4 pulgadas por 14 pulgadas y se utiliza en los siguientes sistemas de OI comerciales:
Las membranas de OI de la serie HF1 de AXEON ofrecen fiabilidad, alto rendimiento y resultados consistentes para aplicaciones comerciales. Todas las membranas se envían secas para una vida útil indefinida, se prueban al 100 % con integridad al vacío y también se pueden solicitar con pruebas individuales en húmedo.
Overall rating: 4.5 / 5 from 2 reviews.
Review topics: ["filters"].
"we are getting lots of great clean water again"
"this was a good filter for a good price, direct fit and easy change out."
Q:
What is the rated output of the AXEON HF1-4014 / 200377?
A:
It is rated for up to 600 gallons per day under specified test conditions. Actual production varies with feed pressure, temperature, dissolved-solids level, recovery, and membrane condition.
Q:
Which systems use the AXEON HF1-4014 / 200377?
A:
The catalog lists: HF1-4014, COM-II-450S, COM450S. Confirm the exact model and part number on your equipment before ordering AXEON HF1-4014 / 200377.
Q:
What should I verify before ordering?
A:
Match the exact part number and 4-by-14-inch commercial element rated at 150 psi, including element dimensions, seal arrangement, permeate connection, rated pressure, and flow-control requirements.
Q:
How do I know when the membrane needs replacement?
A:
Track normalized production and product-water TDS or conductivity. Falling output or rejection after other causes are ruled out can indicate replacement is due.
Q:
Can I substitute a different-capacity membrane?
A:
Only when the system design allows it. Capacity must match the vessel, pump pressure, recovery target, and concentrate-flow control.
Q:
What should I do after installation?
A:
Confirm seals and flow direction, restore pressure gradually, check for leaks, and follow the system instructions for flushing and discarding initial product water.