★★★★★ Sirviendo a más de 60.000 clientes con más de 6.200 reseñas de cinco estrellas.
FILTER FINDER

What system do you have?

Marca
Select your brand...
Modelo
Select your model...

Funda de cuarzo UV VIQUA QS-150 para SPV-2.5 y SP150-HO

Q&As

Funda de cuarzo UV VIQUA QS-150 para SPV-2.5 y SP150-HO

Q&As
Part Number: QS-150
Alt Part Number: 15-1163
El genuino manguito de cuarzo UV de repuesto VIQUA protege la lámpara en los sistemas SPV-2.5 y SP150-HO. Read More
$61.00$76.00
IN STOCK

Descripción

Funda de repuesto para sistemas UV VIQUA Sterilight SPV-2.5 y SP150-HO obsoletos. La funda de cuarzo evita que la lámpara UV se cortocircuite y mantiene la temperatura de funcionamiento ideal de la lámpara de 104 grados Fahrenheit. La acumulación de minerales dificulta la eficacia de la lámpara.

Specs
  • Longitud: 11,1"
  • Reemplace cada 24 meses o según sea necesario
Features
Uso con sistemas UV Sterilight SPV-2.5 y SP150-HO
Helpful Info & Downloads

Q:

Which systems use the VIQUA QS-150?

A:

The catalog lists: QS-150, SPV-2, SP150-HO, SPV-2.5. Confirm the exact model and part number on your equipment before ordering VIQUA QS-150.

Q:

What does the VIQUA QS-150 do?

A:

It isolates the UV lamp from chamber water while allowing UV energy to pass through and helping the lamp operate at its intended temperature. The listed systems are obsolete, so confirm the installed model and current service-part availability.

Q:

How often should the quartz sleeve be replaced?

A:

Inspect it during lamp service and replace it if cracked, chipped, clouded, etched, or no longer restorable. Many owners replace sleeves about every 24 months, subject to the system manual and water conditions.

Q:

Can mineral scale be removed from the sleeve?

A:

Light scale can often be removed with the manufacturer-approved method. Rinse thoroughly and replace the sleeve if deposits, clouding, or etching remain.

Q:

Do I need new O-rings when replacing the sleeve?

A:

Inspect the seals whenever the chamber is opened. Replace O-rings that are cut, flattened, stretched, brittle, or leaking; use only a light coating of food-grade silicone lubricant if directed.

Q:

How can I avoid breaking the new sleeve?

A:

Shut off power and water, relieve pressure, handle quartz with clean gloves, remove grit from sealing surfaces, align the sleeve without forcing it, and tighten retaining parts evenly.

text

Funda de cuarzo UV VIQUA QS-150 para SPV-2.5 y SP150-HO

$61.00$76.00