Great customer service
"Thanks for the great service!"
VIQUA SHO320-QL UV Lamp and Sleeve Kit for SPV-6, SC-320, SCM-320, SP320-HO
Automatic deliveries and charges at your selected frequency. Skip, reschedule, or cancel through your subscription account. View subscription details.
This kit includes the replacement UV lamp bulb and accompanying quartz sleeve for the obsolete VIQUA Sterilight SPV-6, SP320-HO and SC/SCM-320 Series UV systems. It is extremely important to replace the bulb every 12 months to maintain proper system efficacy. The sleeve can be replaced every 24 months or as needed to keep mineral build-up from hindering the lamp's effectiveness.
Why using a genuine VIQUA lamp is important: VIQUA UV systems and lamps are tested and certified as a complete unit. Using an authentic VIQUA lamp ensures proper system performance and water treatment. This video explains the 5 risks of non-VIQUA aftermarket lamps and how to identify authentic VIQUA lamps.
NOTE: Using non-VIQUA lamps voids all UV system certifications and may compromise your warranty should an issue arise.
Overall rating: 5.0 / 5 from 1 reviews.
Review topics: ["service"].
"Thanks for the great service!"
Q:
What is included with the VIQUA SHO320-QL?
A:
The kit includes the matching VIQUA UV lamp and quartz sleeve. Seals and retaining hardware are not assumed to be included unless shown in the package contents.
Q:
Which systems use the VIQUA SHO320-QL?
A:
The catalog does not provide an approved model list for VIQUA SHO320-QL. Match the exact part number, dimensions, connection style, and equipment generation before ordering.
Q:
How often should the lamp and sleeve be replaced?
A:
Replace the lamp every 12 months. Inspect the sleeve during service and replace it when cracked, clouded, etched, or no longer restorable; a common sleeve interval is about 24 months.
Q:
Why replace the sleeve if it is not broken?
A:
Mineral film and surface wear can reduce UV transmission. A clear, intact sleeve also keeps the lamp isolated from chamber water.
Q:
Can I install the lamp and sleeve at the same time?
A:
Yes. Servicing them together can avoid repeat disassembly when both are due. Turn off power and water, relieve pressure, and let the lamp cool first.
Q:
What should I check after installing the kit?
A:
Confirm the sleeve is dry inside, seals are seated without twisting, retaining hardware is secure, the chamber does not leak, and the controller timer is reset.